Safety Engineering
Preliminary / planning-support safety engineering: hazard register drafts, risk matrix support, preventive control mapping, incident response plan drafts, task hazard review (JHA/JSA), and permit-to-work framing. PRELIMINARY ONLY — not a substitute for licensed safety engineer, HAZOP / LOPA / FMEA certification, or permit issuance.
Hazard Register Draft
StandardCategory-driven hazard library expansion (mechanical / electrical / chemical / working-at-height / confined-space / hot-work / lifting / driving / noise / radiation / biological / ergonomic) with preliminary severity hints. Starting register — not a HAZOP.
⏱ 3-6 minutes
Risk Matrix Support
Standard5×5 risk matrix (severity × likelihood) with inherent vs residual comparison and control-effectiveness indicator. Generic tiers — industry-specific matrices may differ.
⏱ 3-6 minutes
Preventive Control Mapping
AdvancedMaps declared hazards to preventive and mitigative control libraries, tagged against the hierarchy of controls (eliminate → substitute → engineering → administrative → PPE). Identifies declared gaps and PPE-dominated strategies.
⏱ 4-8 minutes
Incident Response Plan Draft
StandardScenario-template response plan (fire / chemical-release / medical / electrical / confined-space-rescue / structural / security / generic) with phased actions (detect → alert → contain → evacuate → medical → notify → investigate → recover).
⏱ 3-6 minutes
Task Hazard Review (JHA / JSA)
StandardStep-by-step Job Hazard Analysis with severity × likelihood per step, unmitigated-step flagging, and thin-control detection (controls < hazards). Supports toolbox-talk level reviews.
⏱ 3-6 minutes
Permit-to-Work Framing
StandardPermit-template framing (pre-start / during / close-out) for declared work type — isolation / atmosphere testing / fire watch / rescue plan requirements are activated as applicable. Framing only — this does NOT issue or authorise a permit.
⏱ 3-6 minutes