Fire Protection Scope Framing

Standard

Indicative scope list (extinguishers, detection, sprinklers, standpipes, smoke-control, suppression, emergency power, passive protection) for a building based on type / area / stories / hazard class.

3-6 minutes

DetailsStart Project

Device Zoning Draft

Advanced

Indicative room-by-room sprinkler and smoke-detector counts using generic hazard-class and ceiling-height coverage rules. NOT a code-compliant layout or hydraulic calculation.

4-8 minutes

DetailsStart Project

Inspection & Test Plan (ITM)

Standard

Per-system NFPA 25-style ITM schedule across sprinkler, standpipe, alarm, extinguisher, hood, fire pump, clean-agent, and smoke-control systems.

3-6 minutes

DetailsStart Project

Fire Protection Maintenance Schedule

Standard

Consolidated annual maintenance rollup across facilities. Indicative effort only; excludes specialty multi-year tests (hydrostatic, 5-year internal, fire-pump flow).

3-6 minutes

DetailsStart Project

Fire Pre-Code Review

Standard

Generic NFPA/IBC-style checklist: exit count vs occupant load, common-path limits, sprinkler/height interaction, occupancy-specific concerns. Framing only — AHJ interpretation and code edition must be confirmed separately.

3-6 minutes

DetailsStart Project

Fire Risk Priority Summary

Standard

RPN-style (likelihood × impact × detectability) fire-risk ranking with priority tiers. Advisory — validate with fire protection engineer and on-site walkthrough.

3-6 minutes

DetailsStart Project