Fire Protection
Preliminary / planning-support fire protection: scope framing, device zoning drafts, inspection-test-maintenance plans, pre-code review, and risk-priority summaries. PRELIMINARY ONLY — not a substitute for a licensed fire protection engineer, hydraulic calculations, or AHJ approval.
Fire Protection Scope Framing
StandardIndicative scope list (extinguishers, detection, sprinklers, standpipes, smoke-control, suppression, emergency power, passive protection) for a building based on type / area / stories / hazard class.
⏱ 3-6 minutes
Device Zoning Draft
AdvancedIndicative room-by-room sprinkler and smoke-detector counts using generic hazard-class and ceiling-height coverage rules. NOT a code-compliant layout or hydraulic calculation.
⏱ 4-8 minutes
Inspection & Test Plan (ITM)
StandardPer-system NFPA 25-style ITM schedule across sprinkler, standpipe, alarm, extinguisher, hood, fire pump, clean-agent, and smoke-control systems.
⏱ 3-6 minutes
Fire Protection Maintenance Schedule
StandardConsolidated annual maintenance rollup across facilities. Indicative effort only; excludes specialty multi-year tests (hydrostatic, 5-year internal, fire-pump flow).
⏱ 3-6 minutes
Fire Pre-Code Review
StandardGeneric NFPA/IBC-style checklist: exit count vs occupant load, common-path limits, sprinkler/height interaction, occupancy-specific concerns. Framing only — AHJ interpretation and code edition must be confirmed separately.
⏱ 3-6 minutes
Fire Risk Priority Summary
StandardRPN-style (likelihood × impact × detectability) fire-risk ranking with priority tiers. Advisory — validate with fire protection engineer and on-site walkthrough.
⏱ 3-6 minutes