Electrical Load Summary

Standard

Indicative load schedule summation with diversity factor, continuous-load uplift, and future-reserve allowance. Produces design kW / kVA / line-current estimate. Preliminary planning only — not code-compliant.

3-6 minutes

DetailsStart Project

Panel & Feeder Plan

Advanced

Per-panel indicative feeder current, next-standard breaker suggestion, and panel-fill planning. Preliminary planning only — final selection requires a coordination study.

4-8 minutes

DetailsStart Project

Cable Sizing Pre-Check

Advanced

Indicative cable cross-section recommendation using generic ampacity tables and a voltage-drop target. Does NOT apply derating / grouping / short-circuit withstand — preliminary only.

3-6 minutes

DetailsStart Project

Grounding / Earthing Pre-Check

Standard

Checklist-level pre-check of earthing system (TN-S / TN-C-S / TT / IT), bonding, surge protection, and lightning posture. Framing only — no electrode design or fault-loop measurement.

3-6 minutes

DetailsStart Project

Single-Line Concept Review

Standard

Concept-level review of electrical single-line topology (radial / ring / loop / selective), backup adequacy against critical loads, and utility-voltage sanity. Framing only — no short-circuit / coordination study.

3-6 minutes

DetailsStart Project

Protection Coordination Framing

Advanced

Framing-level review of a protective-device ladder: rating ratios, device-family pairings, and ladder-inversion checks. Does NOT compute time-current curves — a dedicated coordination study is still required.

4-8 minutes

DetailsStart Project