Civil (Preliminary)
PRELIMINARYPreliminary / conceptual civil-structural advisory: load summaries, indicative member sizing, quantity estimates, and code pre-check framing. PRELIMINARY ONLY — not a substitute for licensed structural engineering or code-stamped design.
Conceptual Load Summary
StandardIndicative total load summary for a building concept using typical occupancy/dead/roof load ranges. Conceptual planning only — NOT code-compliant values.
⏱ 3-6 minutes
Preliminary Member Sizing
AdvancedIndicative span/depth and section-modulus estimates for a beam, slab, column, or truss given span and distributed load. Heuristics only — NOT code-compliant design.
⏱ 4-8 minutes
Quantity & Scope Estimate
StandardParametric, concept-stage material quantity estimate (concrete, rebar, structural steel, formwork) by structural system and gross floor area. Order-of-magnitude only.
⏱ 3-6 minutes
Code Compliance Pre-Check
StandardGeneric region-neutral checklist of code-review categories (structural, fire/life safety, accessibility, energy, geotech). Pre-check framing only — governing code must be confirmed for the jurisdiction.
⏱ 3-6 minutes
Structural Concept Comparison
StandardQualitative comparison of structural system concepts (concrete frame, steel frame, composite, masonry, timber, precast) using typical characteristics. Preliminary screening only.
⏱ 3-6 minutes